Images from solar trackers 20kw installation phase 1


Images from solar tracker 20kw installation phase 2


Images from solar tracker 20kw Installation phase 3


Information about the tracker
|
Two-axis solar tracker type -NAVILION –
|
|
Certifications
|
|
TUV HELLAS EUROCODE 1 – EUROCODE 3 – EAK2000 CE
|
|
ADVANTAGES of
INSTALLATION
|
|
MAXIMUM
EXPLOITATION OF SURFACE SOIL (28 to 35kw / 1000 m²
INSTALLATION – ASSEMBLY WITHOUT crane vehicles
EASY INSTALLATION – MAINTENANCE AND CLEANING THE PANEL PURPOSE OF LOW
HEIGHT CONSTRUCTION
|
|
ADVANTAGES of
CONSTRUCTION
|
|
CONSTRUCTION TRACKER SPECIAL
REASON ARTHROTIS DIMENSIONAL STRUCTURE
Better for GRIP WHEEL , minimal accumulation of impurities ,
EASIER ADAPTATION OF SPIN CYCLE PURPOSE OF THE RINGS
|
|
DIDYMES WHEELS PAIR IN ORDER TO
BETTER Dispatching
|
|
MINIMIZE rubbed MOVING PARTS
USING friction material in conjunction with ANOXEIDOTOUS AXES
|
|
The construction of framework,
a cross section penetrates the other hand, where there WELDING FOR
GREATER STRENGTH AND BETTER QUALITY GALVANISMATOS .
|
|
ADVANTAGES CONTROL
|
|
CONTROL PANEL AND HYDRAULIC
SYSTEM IN EVERY TRACKER.
SENSOR OIL LEVEL , END BOUNDARY MOTION , SENSOR REFERENCE ELEVATION ,
ensures correct operation in TRACKER.
|
|
MOTION , SENSOR REFERENCE
ELEVATION , ensures correct operation in TRACKER.
|
|
SENSOR LIGHT To avoid
unnecessary traffic in the event HEAVY clouded .
|
|
TEMPERATURE SENSOR ACTIVATES
Function AVOID ACCUMULATION FOR SNOW DURING THE NIGHT .
|
|
WIND SPEED SENSOR FOR leveling
PANEL.
|
|
THE MEASUREMENT OF MOVEMENTS IN
AZIMUTH IS ABROAD CYCLE for greater accuracy .
|
|
THE CASE OF FAILURE TO DRIVE
TRAKER special circumstances ACKNOWLEDGE IMMEDIATELY AND STOP THE
INSIDE Function 5sec TO AVOID DAMAGE .
|
|
SCREEN CONTROL appear HOURS AND
DETAILS ABOUT THE CONDITION OF TRACKER.
|
Files about all trackers(PDF)
mechanoesis_broshure_final
ΝΑΥΗΛΙΟΝ ΧΑΡΑΚΤΗΡΙΣΤΙΚΑ
Πιστοποιητικό TUV 100kw